A sealed engineering letter for your factory-built unit on its permanent foundation — for the lender who needs to see affixture, or the building department that needs to see conformance. You take the photos, our app guides every shot, and a licensed Professional Engineer performs the review and seals the letter.
A state-approved modular unit is built to the International Building Code and International Residential Code, inspected under a state industrialized-building program, and set on a permanent foundation designed for the site. It is not a HUD-code manufactured home: no HUD label, no 24 CFR Part 3280, and HUD’s Permanent Foundations Guide for Manufactured Housing does not govern it.
Modular housing generally finances as site-built, which usually means better rates and a wider set of loan programs than the manufactured-home bucket. Files get misrouted anyway — often because nobody with a license has put the distinction in writing. Our letter identifies the unit from its build data placard and approval-agency insignia, records that no HUD certification label was observed, and says so in one plain sentence. That sentence has unstuck loan files on its own.
We only write that sentence when the photographs actually support it. If your placard is missing or unreadable, the letter says what we saw and no more — and we will tell you before you pay for something that won’t help.
One minute from Enrique Lairet, PE — the licensed engineer who personally reviews and seals every letter.
Oasis Engineering is the firm behind EngineerLetters.co. These reviews are about our foundation certification work generally — the same licensed PE reviews and seals every letter, whatever the unit.
“This is the smoothest experience we’ve had with an engineering certificate — anybody at our company. We’re definitely going to be giving you more business as it comes through.”
Matthew Martinez · loan officer, National Mortgage Home Loans · by phone, Aug 2026
“As a mortgage lender, I am frequently having to order engineering certificates for foundation verification. I have never worked with a company that was as fast, responsive, and overall as kind as Oasis was. They were incredible. Our report was issued in under 12 hours with no issue.”
Trinity Thompson · mortgage lender · Oct 2024
“These guys were awesome! I had the certificate in less than 24 hours, and were cheaper than the local engineer I was going to use. They will for sure get all my business for my FHA/VA deals.”
Shantel Matagi · FHA/VA deals · Jun 2024
“We needed an engineer letter for the foundation of a home! Enrique was so easy to work with and got the letter back to me within a few hours!! I highly recommend Oasis Engineering.”
Hannah Simons · Google Local Guide · Jun 2024
“Without his service I don’t think I would have gotten the Mortgage on time. A huge thank you for making this process easy and stress free. I’d give him 10 stars if I was allowed.”
Michael Rodriguez · homeowner · Jun 2024
For a unit that is already set on its foundation.
Factory-built units ship with a flat base. The foundation underneath is a separate design, permitted separately, and the manufacturer’s drawings say so in as many words — the concrete is always “designed and built by others.” That is engineering we do.
Tell us about your site and a licensed engineer will reply personally — not a form letter, and not a sales call. If the answer is “you don’t need us for this,” we’ll say that too.
The letter does three things: it identifies the unit from its build data placard and approval-agency insignia and records whether a HUD label was present; it states that the as-built foundation, the unit-to-foundation anchorage, and the observable connections conform to the approved plan set and the manufacturer’s installation manual; and it gives an engineering opinion on permanency and affixture. Where a lender asks for it, HUD’s PFGMH is cited as a recognized benchmark for permanency — explicitly by analogy, never as the governing standard for a modular unit.
It is based on photo documentation captured under our guided protocol plus the approved plan set, and it says so plainly. Concealed construction — reinforcement, embedment, footing dimensions below grade, concrete strength — was not exposed and the letter states that too. The engineer retains the unconditional right to request retakes or a site visit, and no certification is issued until the evidence supports it. Read our full methodology →